Operational
CEC operates under the following key pillars:- CEC Power Renewables Projects
Fri, 5 Jun, 2020 at 10:46 AM
CEC owns 42 high voltage substations and a dedicated control centre.
Fri, 5 Jun, 2020 at 10:46 AM
CEC accounts for over 50% of power consumed in Zambia.
Fri, 5 Jun, 2020 at 10:47 AM
CEC acquired a biodiesel refinery with a capacity of 900,000 litres per annum to produce an environmentally friendly and low-cost fuel as an alternative to ...
Fri, 5 Jun, 2020 at 10:51 AM
Yes. We are developing a 20MW Photovoltaic (or “PV”) solar plant on the Copperbelt that will generate clean, reliable energy. The project will be developed ...